Installed in Philips zero boil-off magnets, the RDK-408C2 coldhead is operated by the CSW-71D and F-50HC Compressors.
Installed in Philips zero boil-off magnets, the RDK-408C2 coldhead is operated by the CSW-71D and F-50HC Compressors.
The CSW adsorber should be replaced every 20,000 hours (28 months) and with each coldhead service to help protect the system from oil contamination.
The F-50 adsober can be replaced every 30,000 hours.